Application Form

APPLICATION FOR IMPROVEMENT TO LOT

AIR CONDITIONING SYSTEM
  • Max. file size: 10 MB.
  • I/We understand this approval may be subject to, but not limited to the conditions listed below: The lot owner must comply with the conditions of this approval and the body corporate by-laws; The improvements must be installed in the location(s) specified in the Air Conditioning Plan for the building.The external compressor unit must be mounted with sufficient vibration isolation to ensure no vibration is transferred from the unit to the wall of the building; The improvements must not be of a lesser quality than the standard of the complex generally; All costs associated with the improvement must be borne by the lot owner both now and in the future; The lot is maintained in good repair and condition and all repairs and maintenance will be the responsibility of the lot owner; The work is carried out by properly qualified tradesperson; Where necessary, appropriate council permits are obtained for this improvement; The tradesmen do not leave any tools or equipment on common property and that all work takes place within the lot; The tradesmen dispose of all debris correctly and that no debris at any time will represent any danger to anyone entering onto or leaving the premises; The tradesmen supply evidence of their public liability and personal accident insurance cover; Responsibility be taken for any damage which may be done to any property or any other lot as a result of the improvement; The Body Corporate is advised of the final cost upon completion so that this can be noted on the Body Corporate records and the insurance company can be advised of the improvement; Care be taken at all times to minimise any inconvenience to any other residents and that works are carried out between the hours of 8.00am to 5.30pm Monday to Friday, 8.00am to 4.00pm on Saturday. No work to be carried out on Sundays or Public Holidays; If the improvement is temporary, the lot is to be returned to the same condition prior to the improvement at no cost to the Body Corporate; The body corporate is indemnified from all claims arising out of the improvement (commencement of work signifies acceptance). The noise level of the air conditioning unit must comply with the Council regulations.